Monday, 23 June 2014

Galvanized iron roof sheets

New galvanized iron roof sheets are best left to weather for a full year before coating. This, however, is not always possible in practice. Should the roof sheets need to be coated within this time period, or if a water-proofing system is to be applied over a portion of the area, it is essential to first thoroughly degrease the area to be coated. This removes the residual oily layer present on the new roof sheets when supplied. There are many products available that will successfully accomplish this - we have an eco-friendly water-based product called Tornado Degreaser on our range that is ideal for this application. This will ensure the good adhesion to the substrate of the coating to be applied.

Friday, 20 June 2014

Wine Cellars - Specification file for all buidings

One of the services we offer to wine cellars is the compilation of a file of specifications for the re-coating of all buildings on the estate. This gives the Maintenance Manager all of the surface preparation and coating instructions,  product requirements and quantities for all of the buildings from the main homestead, managers house, labourer's cottages through to the cellars. This can be used any time in the future for maintenance budgeting and planning. This is done free of charge and with no obligation.

Wednesday, 18 June 2014

Wine and fruit industry coatings

Now that the harvest time is over, maintenance starts on wine cellars and in fruit packaging warehouses. We have an impressive portfolio of customers in these industries and offer a full package of advice, training and products approved for use. Large amounts of money can be saved by good planning and routine coating maintenance. We service the entire Western Cape and have references from top clients. As an additional service we keep full records of all products used for HACCP, GLOBAL GAP and ISO inspections. We are listed as a supplier in the Wineland Directory 2014 edition due to go into circulation 1 July.

Tuesday, 17 June 2014

Joint Sealer

This product was developed during 2013 at the request of a mass housing developer constructing panelled houses in the Western Cape. It is used to seal the joint between panels, and the main requirements are good adhesion to the substrate, flexibility and high film build. Essentially, it is a high solids acrylic formulated on a blend of binders to provide the required properties. As with all products of this type, there is a degree of shrinkage on drying, necessitating two "coats" to be spackled into the joint. Since the successful introduction of the product, contractors have used it to fill plaster cracks with equally good results. Its toughness and flexibility would make it a good option to seal between timber panels used to construct timber homes, in addition to the above applications.

Thursday, 12 June 2014

Coating of cement floors

After inspecting a floor for an applicator to determine its suitability for coating, I feel that putting down a couple of essential pointers would be appropriate. Previously uncoated cement screed floors need to be fully cured, dry, free of oil or dirt, and of a sufficiently rough profile before coating. Often calls come in from applicators or home owners after the coating has been applied asking why problems have occurred - all of which could have been prevented had these guidelines been followed.  Cement slab driveways and verandas (stoeps) are often thrown without a damp proof course below them - here the rule is simple - do not coat them.
Allow at least 28 days for the cement topping to cure, then check the moisture level with an appropriate moisture meter. The moisture level should ideally be below 12% as measured by  a Protimeter. Ensure that the profile of the surface resembles 100 grit sand-paper, if not mechanically abrade the floor using a floor grinder. This step will often remove surface dirt and oil at the same time. All dust should then be removed by sweeping or vacuuming the surface clean.
The first coat can now be applied - preferably thinned 10% by addition of the relevant solvent. Generally, a 24 hour drying time should be allowed before application of the first unthinned top-coat. After another 24 hours, the second top-coat can be applied. Depending on the coating type, there will be a specific time that needs to be allowed before the coating is subjected to heavy traffic.
Coating types vary from Water-based Acrylics to single pack Alkyd and Polyurethane-Alkyd enamels, then on to the Twin Pack Epoxy and Polyurethanes. There are cost and performance advantages related to each of the above options - check with your supplier as to which one best suits your requirements.

Tuesday, 10 December 2013

Premature fading of roof coatings

Many failures have been seen over recent years of roof coatings, particularly where dark colours are concerned. Temperatures of metal roof sheets have been measured as high as 110 degrees centigrade in the Western Cape area in South Africa. Recent work suggests that the acrylic binders used in roof coatings simply cannot withstand such high temperatures and degrade after as little as a year. The introduction of so called 'cool roof' technology - which simply involves the replacement of the iron oxide pigment with an infra-red reflecting variant, seems to be sorting this problem out. Costs are considerably higher, but the benefit of a lower internal temperature saves costs and provides a more comfortable indoor environment.